Home >> Products >> Athletic Running Track System
  • Sandwich Running Track System
  • Sandwich Running Track System
  • Sandwich Running Track System
Sandwich Running Track SystemSandwich Running Track SystemSandwich Running Track System

Sandwich Running Track System

SHARE:

Sandwich Running Track System is suitable for all types of school sports track project design of all-water impermeable running track with advantage of durable, environmentally friendly, anti-aging, UV-resistant, wear-resistant, in line with international and professional events, is a common choice for athletic running track project and jogging track project. 

Product Details

Sandwich Running -Track System-5.jpg

Sandwich Running Track Materials TDS



PU Binder Primer/PU Binder for SBR or EPDM Rubber Granules

Single component PU binder for primer and work with SBR/EPDM rubber granules
Export (Spec):ACA-1670
  • Density                                                                                       1.0-1.1g/cm3

  • Viskosity                                                                                     5000 mPas,25℃

  • Packing Size                                                                               20kg/drum; 200kg/drum

  • Color                                                                                           Completely Transparent or a little Yellow transparent

  • Shelf life/Storage                                                                        12 months at 10-30 ℃ avoid direct sunlight

  • Shbstrate and applicatiion temperature                                     5-35℃ (mid 3℃ ,above dew point)

  • NCO content                                                                               6.5~7

  • Permissible relative humidity                                                       Min 40%~Max 90%

  • Can be walked on                                                                       3-4 hours

  • Material consumption                                                                  0.15-0.2kg/m2




1:4 Full PU Material for Seal layer

Two-component, environmental protection, self-leveling
Export (Spec): ACA-1760/ACA-1270
  • Density                                                                                        1.2-1.30/cm3, 25 ℃

  • Viskosity                                                                                      12000~15000cps, 25 ℃

  • Packing Size                                                                                 ACA-1760: 200 kg/drum ;  ACA-1270:250 kg/drum

  • Color                                                                                            Red/Green/Blue

  • Shelf life/Storage                                                                         12 months at 10-25 ℃ avoid direct sunlight

  • Shbstrate and applicatiion temperature                                      5-35℃ (mid 3℃ ,above dew point)

  • Permissible relative humidity                                                       Min 30%~Max 90%

  • Can be walked on                                                                       16-20 hours

  • Material consumption                                                                  2 kg/ m2  ( ACA-1760:ACA-1270=1:4 )



1:3 Full PU Materials for Broadcast layer

Two-component, environmental protection, self-leveling
Export (Spec): ACA-1760/ACA-1280
  • Density                                                                                        1.15-1.20/cm3, 25 ℃

  • Viskosity                                                                                      13000~15000cps, 25 ℃

  • Packing Size                                                                                 ACA-1760: 200 kg/drum ;  ACA-1280:250 kg/drum

  • Color                                                                                            Red/Green/Blue

  • Shelf life/Storage                                                                         12 months at 10-25 ℃ avoid direct sunlight

  • Shbstrate and applicatiion temperature                                      5-35℃ (mid 3℃ ,above dew point)

  • Permissible relative humidity                                                       Min 30%~Max 90%

  • Can be walked on                                                                       16-20 hours

  • Material consumption                                                                  2.5 kg/ m2  ( ACA-1760:ACA-1280=1:3)


Main Construction Step:

1. Primer and rubber elastic layer installation with pavement machine

2. 1:4 Full-PU levelling material mix with rubber powder for sealer coat.

3. 1:3 Full-PU levelling material for Broadcast layer coat.

4. Broadcast the EPDM granules and make the line.

Sandwich Running -Track System.jpg

Products List news list